The first change a visitor to the Derby Recreation Center will notice is the entrance is no longer on the front of the building, but instead a temporary entrance is located on the east side (left when facing the front from the parking lot).
To make the walk to the new entrance more safe and easier to navigate, a temporary sidewalk was also added connecting the main parking lot to the new temporary entrance.
The most notable change, even visible from a distance, is the beginnings of the new clerestory (windows located on the roof to allow natural light into the foyer).
The process began with a hole cut into the roof and that portion of the roof was lifted away.
Just for fun, the DRC's Art Director made a video of the roof raising process.
The remaining hole was the first outward appearance of the roofline changes to come.
The addition of the iron beams gave basic shape to the clerestory.
The remaining portions of the new window area (clerestory) was framed in and currently looks like this.
According to schedule, the following has been accomplished:
· In November, the Derby Recreation Commission moved all administrative
operations out of building.
Offices for administrative staff are moved to a school district building at 724 E. Market,
and the Oaklawn Activity Center.
· All classes generally held in the DRC Activity Studio were moved to the OAC and/or school facilities.
·
All art classes were moved to alternate sites
provided by USD 260.
· Patrons continue to be assisted with finding alternate
locations for functions which in the past have occurred in the DRC meeting and
community rooms. Options include city facilities, school locations and the Oaklawn Activity Center.
· In February, a temporary entrance on the east
side of the building replaced the north entrance.
Looking ahead here are some of
the things that you can expect to see as we progress through our remodel:
·
Temporary closure of partial areas of gymnasiums
for the installation of updated lighting and sound systems (April 2013)
·
Fitness center equipment will be moved from its
current location in the former activity studio back to the weight room area. This will probably require some equipment to
also be located in the alcoves of the east area of the track (May 2013)
· Relocation of the spin room activities to an
alternate location (OAC) for the construction of the 2nd floor restrooms (May
2013)
· Owner occupancy to the front area of the Derby Recreation Center (July
2013)
· Locker room and pool renovations begin (August
& September 2013)
·
Demolition and re-purposing current control desk
in the 1994 building into administrative offices (August 2013)
·
Owner occupancy of facility and completion of
project (November 2013)
As you can see, there is still much to be accomplished, but we are well on our way. As always if you have any questions, please contact us at (316) 788-3781.
No comments:
Post a Comment